AppWorx / Modify job schedule

Tags SOP

Objective

  • To provide instruction on modifying an AppWorx job schedule

Environment

  • 737843: AppWorx

Procedure

  1. Open AppWorx
  2. Select either the Jobs Selector or Process Flows
  3. Search for the job or process flow that needs updated
  4. Select the job or process flow
  5. Select Edit
  6. Select the Schedule tab
  7. Select Edit
  8. Update the schedule as needed
  9. Verify that the Active checkbox is checked
  10. Select Apply 
  11. Save

 

Temporarily stop a schedule

  1. Open AppWorx
  2. Select either the Jobs Selector or Process Flows
  3. Search for the job or process flow that needs updated
  4. Select the job or process flow
  5. Select Edit
  6. Select the Schedule tab
  7. Select Edit
  8. Uncheck the Active checkbox
  9. Select Apply
  10. Save
  11. Repeat steps 1-10 to check the Active checkbox when ready to resume job or process flow on schedule

 

Details

Article ID: 17489
Created
Mon 10/17/16 1:49 PM
Modified
Thu 10/19/23 12:49 PM