Print
Print:
Body
AppWorx / Modify job schedule
Body
Objective
To provide instruction on modifying an AppWorx job schedule
Environment
737843: AppWorx
Procedure
Open
AppWorx
Select either the
Jobs Selector
or
Process Flows
Search for the job or process flow that needs updated
Select the job or process flow
Select
Edit
Select the
Schedule
tab
Select
Edit
Update the schedule as needed
Verify that the
Active
checkbox is checked
Select
Apply
Save
Temporarily stop a schedule
Open
AppWorx
Select either the
Jobs Selector
or
Process Flows
Search for the job or process flow that needs updated
Select the job or process flow
Select
Edit
Select the
Schedule
tab
Select
Edit
Uncheck the
Active
checkbox
Select
Apply
Save
Repeat steps 1-10 to check the
Active
checkbox when ready to resume job or process flow on schedule
Details
Details
Article ID:
17489
Created
Mon 10/17/16 1:49 PM
Modified
Tue 10/15/24 4:13 PM